From the first brick to the front door.

Clay brick walls rise on the slab. Every opening is already where a window will be.

Week 3

A second storey

Concrete ring beams tie the ground floor together and carry the upper floor and its balcony.

Week 5

The roof goes on

Timber rafters span the house. The flat roof is sheathed, insulated and sealed before the first rain.

Week 8

Larch and glass

Untreated larch wraps the upper floor. Triple-glazed windows fill every opening, floor to ceiling.

Week 11

Weather-tight

White render below, a dark roof edge above. The shell is finished and the inside work begins.

Week 14

Move in

Turf rolls out, the path is laid and the keys change hands. Home.

The finished house with larch cladding, white render and a fresh lawn

The finished house

Fourteen weeks, one family home.

Two floors, a sheltered balcony and views across the meadow. Built with brick, timber and glass, ready to move into.

168 m²

Living area

14 weeks

From slab to keys

A+

Energy rating