Scroll to build
From the first brick to the front door.
Clay brick walls rise on the slab. Every opening is already where a window will be.
Week 3
A second storey
Concrete ring beams tie the ground floor together and carry the upper floor and its balcony.
Week 5
The roof goes on
Timber rafters span the house. The flat roof is sheathed, insulated and sealed before the first rain.
Week 8
Larch and glass
Untreated larch wraps the upper floor. Triple-glazed windows fill every opening, floor to ceiling.
Week 11
Weather-tight
White render below, a dark roof edge above. The shell is finished and the inside work begins.
Week 14
Move in